Getting ready for our January ski trip to Breckenridge, CO. We've had to deal with temps down to 20 and 30 below zero (F) on past trips.
At those temps, the gate valves freeze. So this year I'm adding heat tape designed for the gate valves by UltraHeat.
Just finished building the control box with fuses and switches for each valve. Hope to get it all installed this week.
Operation is to switch a heater on for 5-10 minutes before operating the valve which hopefully let me manage the tanks without regard to weather.