Well, we made it, but backed up in traffic on I-96 East of Grand Rapids, from 2 lanes down to 1 lane for 10 miles & 55 minutes for road work, or lack there of.
Big road sign said, “Left lane closed 9 miles ahead”, and that was where the backup started.
When we arrived at the site of road repair, there was about a 10’ x 10’ piece of Concrete removed from the road and not a person in site, equipment there, but no people.
Summer in Michigan
We are on site #44 backed up to river, what a view.
Very nice find Don & Jo.
Hockster