DH and I decide together if the rig is positioned OK. (Will the sewer hose reach? Will the slides fit? Will the tv antenna be able to go up?) I put down the blocks and chock tires. After the rig is set, I go inside with a walkie talkie and we communicate about level, as I put a level in the fridge and other surfaces. I then put out the slides, one by one(electric), as he watches. Once that's done, I get to work on the insides as he finishes hooking up everything outside. I put out the toiletries/toilet paper holder, bring out the end tables, unstrap chairs, set up the eating area, etc. Then DH comes in and usually gets food ready. (He's the cook of the two of us!) After we eat, he sets up the TVs and other electronics, and I do more straightening/organizing. Works well for us. If we try to help too much in each other's chores, it doesn't go as well. LOL!
Erika