It is time to once again replace my Elkridge 292 Extreme Lite trailer tires. I am planning on gettting Goodyear Endurance ST 225/75 R 15 E1 tires. The spare which has been on the ground for all of 15 miles is 6 years old and will probably replace that also. Now for the question. Should I...
Ok did that the info given was stated in my above post. Next question now planning on using Plus bolts, 1/4 - 20 or 5/16 - 18 to hold down my strut channel to the roof?
Planning on installing Solar Panels on my 2016 Elkridge E-292. Spoke to a factory guy who stated the roof on the 2016 E-292 is basically 4ft x roof with aluminum c channel frames with styrofoam in the center and no ribs in between. Have any of you out there installed solar on your E-292? Is...
Living in AZ snow load is not a factor approximately 99.9995% of the time. Spent way to much time in the Infantry wet cold tired and hungry without having a choice to willingly subject myself to those conditions at my age. Your advice about the butyl rubber appears to be sound. The solar...
figure out the kilowatt your Alternating Current devices need Which items will be used simultaneously. The time those items will be run per day. The Max Kilowatt draw will tell you the size inverter you need. The Kilowatt hours times the number of hours per 24 hours will tell you the 120 volt...
Received a call from Heartland. Apparently in 2016 the E-292 roof is essentially made up of 4 ft x width of roof panels with C channel aluminum frames with Styrofoam in the center and no ribs in between. I will verify this with my stud finder. I have received the 4 10 foot pieces of strut...
Yes exactly essentially if your distribution box had the converter wired to one breaker the multiplus should provide sufficient current to power the other loads that was on that circuit.
My plan for mounting panels on my 2016 Elkridge E-292 Extreme Lite is to use 2 10 foot strut channels on either side of the RV behind the crest line and attach 2 58 x 28 inch 210 or 215 watt panels hooked in series down either side of the trailer and probably drop the wires either down the sink...
Re: Battleborn Lithium batteries/Victron 3000 Multiplus install
THe reason why I am looking at using 2 SCCs is 2 good 40 Amp SCCs cost considerably less than 1 60 Amp controller. Also I am running 150 AMP bms on the 310 AH Li FEPO4 batteries I will build
Wonder if the reason only 32 amps rather than 50 Amps of shore power on that one leg is because the other 18 Amps are used by the converter part of the Victron Multi 3000?
I am also starting down the Solar System Rabbit Hole. I am building my own 310 AH Lithium FEPO4 Batteries 2 from Chinese Cells 8 of them are supposed to be on the boat. The plan is to mount 4 210 Watt solar panels on the roof 2s and then run each of the series pair to their own 40 AMP SCC and...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.