Loco
Well-known member
Well I have been waxing the out side of our Cyclone. Man I am getting a work out. Waxing a 40 ft Toyhauler is a job. Started at the back right corner and working my way to the left front. I have made it to left front slide out after spending about 6 hours on it. But man does it look good now. I figure I will be done with it all in about 8 more hours of work. I did not realize how much of the shine had gone away till I started the wax job.