Friday, I installed the first phase of my solar. I installed 2 Renogy 100 watt panels, a combiner box on the roof, a Bogart Engineering SC-2030 controller, and a Tri-Metric 2030 monitor. I used 10awg wire from the panels to the combiner box, with the two panels connected in parrelel, and 4awg wire from the combiner box down to the controller. Peripheral items in the install included a shunt (500), and 2 60amp circuit breakers to isolate the controller. The hardest parts were stringing the 4 gauge wire, and getting a solid connection on the 4 gauge wire in the circuit breakers in the small Baby Box.
Next, I plan to add 2 more panels to the roof, and upgrade my battery bank to four 6 volt batteries.