cdbMidland
Past Michigan Chapter Leader
In an earlier post, Scott stated that since the valves are operated by cables, they are closed when there is still give in the line. I tested my unit today and indeed this is true.
However, there is an apparent mix-up between the labels and the actual valves (from left to right)...
As labeled......................... As tested
Waste tank ........................Gray tank #1
Gray tank #1 .....................Waste tank
Gray tank #2 ......................Gray tank #2
Now I am no longer sure about the tank monitor as well. Are the tanks plumbed wrong, mislabeled, mis-cabled, or what?
However, there is an apparent mix-up between the labels and the actual valves (from left to right)...
As labeled......................... As tested
Waste tank ........................Gray tank #1
Gray tank #1 .....................Waste tank
Gray tank #2 ......................Gray tank #2
Now I am no longer sure about the tank monitor as well. Are the tanks plumbed wrong, mislabeled, mis-cabled, or what?
Last edited: