4WheelingPotters
Member
I have the similar concern
Go Power has AWSOME customer service, Heartland is the problem.....
Lack of thought for location for the controller. In my T32 it NEVER was going to fit where they said to put cut the whole, NOT happy.
moving on.....
I purchased 2 flex panels, IC2000 inverter/charger w/remote and relocated the batteries to step area. Which poor planing with Heartland, should be there anyways, (too far from controller)
Go Power does not have a MPPT controller as of yet and the PWM30 is good up to 500w in parallel only!
Following for MPPT controller updates......
Go Power has AWSOME customer service, Heartland is the problem.....
Lack of thought for location for the controller. In my T32 it NEVER was going to fit where they said to put cut the whole, NOT happy.
moving on.....
I purchased 2 flex panels, IC2000 inverter/charger w/remote and relocated the batteries to step area. Which poor planing with Heartland, should be there anyways, (too far from controller)
Go Power does not have a MPPT controller as of yet and the PWM30 is good up to 500w in parallel only!
Following for MPPT controller updates......