was wondering how long did it take for your dealer to have your RV ready for the PDI from when you signed the papers
I signed for mine on 3/28/15
and still waiting
Pre Delivery Inspection
Hi Brett,
Elapsed time from making a deal for a trailer on the lot, and the time it's ready for you to walk through is primarily a matter of dealer scheduling, based on how busy they are at any given time. With lots of people buying RVs this time of year, and getting RVs de-winterized and repaired, it might take longer than it would in February. It can also take extra time if they were prepping it and inspecting and found something that needs to be fixed. After 10 days, I'd for sure be asking about what's causing the holdup and when they'll be done.
But generally they're motivated to complete their work quickly so they can get you to sign the acceptance paper and give them the money - which of course should be done after the Pre-Delivery Inspection. If they had you sign acceptance and pay before the PDI, you might want to have a meeting with their management team about what the proper order should be and how they're going to move things along. If you haven't signed the acceptance letter, don't sign until everything is right.
I would also strongly recommend that you not take the trailer off the lot until you are satisfied that it is working correctly and that all issues have been correctly addressed.