In the install manual it says to run a ground from the battery to the frame and from the ground screw on generator to the frame. I have a 2017 Torque 325 with generator prep package. Has everything there I was just curious if I could run the ground from the generator back to the ground on...
Can anyone tell me what gauge wire the gen prep circuit is wired with. The red, white and black appear to be heavier gauge wire compared to the wiring harness coming out of the Onan 5500. Is wire nuts sufficient to join these together? Thanks
We have a torque 325 and have the same problem. We were told that you have to take the screws out of the box and lift it up even with the lip in order to get the 5509 in the opening. This is a terrible design and we would like to know if anyone has a better way of doing it. Ours didn’t come with...
I answered my own question. I found transfer switch behind a panel in the front box. I’m guessing the generator install will be pretty much plug and play. It has a box labeled generator circuit and has wiring harness for start switch inside coach.
Hi guys. First post on this forum. We recently bought a Torque 325 with gen prep but no generator. I’m going to purchase an Onan 5500 evap and was needing to know if I have a transfer switch already or do I need to purchase one. I haven’t took off any panels or got that deep into it but I can’t...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.