Hey all, I have a question about my installation project that I'm already knee deep in and contrary to my popular belief, I should have planned better.
The short version is: I have a 2006 Jayco Seneca ZX that had the ATS and breaker panel recalled quite a while ago but was never replaced , so I decided to do it all at once with the addition of adding solar capability. A friend gifted me a brand new IC2000 (Go Power) and the recommended Progressive Dynamics panel, I also upgraded to a 230ah Litime lithium battery. I recently noticed that the new panel has 4 less spaces for breakers than the original one, so I'm trying to figure out which installation option I should go with, to get the additional breaker space.
My specific question , for anyone who's gone through this, is , with the split phase options 50 amp, they show a second inverter. Is split phase only applicable for installs with (2) inverters? Thanks!
The short version is: I have a 2006 Jayco Seneca ZX that had the ATS and breaker panel recalled quite a while ago but was never replaced , so I decided to do it all at once with the addition of adding solar capability. A friend gifted me a brand new IC2000 (Go Power) and the recommended Progressive Dynamics panel, I also upgraded to a 230ah Litime lithium battery. I recently noticed that the new panel has 4 less spaces for breakers than the original one, so I'm trying to figure out which installation option I should go with, to get the additional breaker space.
My specific question , for anyone who's gone through this, is , with the split phase options 50 amp, they show a second inverter. Is split phase only applicable for installs with (2) inverters? Thanks!