Wow Terry - I bet you have well over 10-12K in damage there!
Hope you have better luck with your insurance company then I have had with mine. I still haven't had a settlement from when we were hit in May.
So sorry you had to experience this. If I may ask, who is your insurance carrier and how are they treating you?
Wow Terry - I bet you have well over 10-12K in damage there!
Hope you have better luck with your insurance company then I have had with mine. I still haven't had a settlement from when we were hit in May.
Terry. Almost home and this happens. Glad everyone is ok. If anyone cans fix things as good as new, it's you. Keep us updated.
I towed the Landmark to the Trailer Alignment shop for evaluation of the front left Mor-Ryde IS unit being out of alignment from the collision. They determined the proper way to fix it is to replace the whole front left Mor-Ryde IS unit. Also the frame near the front left Mor-Ryde IS was bent 1/8” from being true and straight. The IS part is built for each order and will take about 5 to 7 days to be delivered. Hopefully the part will ordered tomorrow. Then the shop will need to schedule the replacement and repair which will take 2 days. So it appears we will be here in Memphis for about 10 to 14 days.
Have they checked the frame around your level up leg?I towed the Landmark to the Trailer Alignment shop for evaluation of the front left Mor-Ryde IS unit being out of alignment from the collision. They determined the proper way to fix it is to replace the whole front left Mor-Ryde IS unit. Also the frame near the front left Mor-Ryde IS was bent 1/8” from being true and straight. The IS part is built for each order and will take about 5 to 7 days to be delivered. Hopefully the part will ordered tomorrow. Then the shop will need to schedule the replacement and repair which will take 2 days. So it appears we will be here in Memphis for about 10 to 14 days.
If you're a Blues music lover Beale Street is a little slice of heaven!Below is my things to do in Memphis with checks by what we've done. Some of them are from you Go get you some bird at Gus's Fried Chicken!
<!--?xml version="1.0" encoding="UTF-8" standalone="no"?-->Memphis
<input type="checkbox" checked="checked">Graceland
<input type="checkbox" checked="checked">Visitor Center (MS River side) - per Byrd Mathis
<input type="checkbox" checked="checked">Sun Studio - per Byrd Mathis
<input type="checkbox">St. Judes Hospital - Danny Thomas memorial per Byrd Mathis
<input type="checkbox" checked="checked">Mudd Island
<input type="checkbox" checked="checked">Beale Street
<input type="checkbox">BB Kings night club on Beale St - too $$ cover charge
<input type="checkbox" checked="checked">Peabody Hotel (ducks at 11 and 5)
<input type="checkbox">Eat BBQ at Corkys per Dave/Julie
<input type="checkbox" checked="checked">Rendezvous BBQ on Beale Street
<input type="checkbox">Memphis Zoo
<input type="checkbox" checked="checked">Blues City Cafe (ribs and fried shrimp per Terry and Carol H) - on Beale Street
<input type="checkbox" checked="checked">Gus' Fried Chicken - 310 South Front Street (per Terry and Carol H)
<input type="checkbox" checked="checked">Dyer's (Hamburger) per Travel Channel (old grease)
<input type="checkbox">Civil Rights Museum - Dave and Kathy Latta
<input type="checkbox" checked="checked">Rock and Soul Museum - Dave and Kathy Latta
<input type="checkbox">Pink Palace
<input type="checkbox" checked="checked">Staxx Museum
<input type="checkbox">Boiling Point Restaurant for Shrimp and Grits - South Haven, MS - per Rex and Stacy Hastey on Facebook
<input type="checkbox">Bass Pro Shop in the Pyramid
Have they checked the frame around your level up leg?
You waited a while to get those parts. I'm guessing they had to make them.Today the Mor-Ryde IS Suspension parts arrived at the truck frame and alignment shop. The suspensions repairs will begin tomorrow at 8 am and it may take up to two days to be completed.