Can't do Jim, not time, besides, we have to trade the old rig in and get some other stuff done. New one due to be built the 11-12 of Aug, delivery time to Knoxville--Rally the 20th?. It is 2 days to Knoxville, time for PDI and stuff transferred, then rally. That is if dates are firm. We still work and have to take time off, need time for that. Well, a delima at best. Think it will be the ole 3500RL at the rally and dream of the new one the next time. Nan